Zhengzhou City Twenty-third Middle School Teaching Complex Project

Project Name: Zhengzhou City Twenty-third Middle School Teaching Complex Project Progress: Preliminary Design and Construction Period: 2011-2012 Major Equipment: Fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, lighting facilities, cranes .
Project Introduction:
The project is located in No.4 Middle School of Zhengzhou City (No. 4 Jing'er Road, Jinshui District, Zhengzhou City). The total area of ​​newly-built teaching complexes and ancillary facilities is 17,618 square meters, of which the above ground construction area is 13,618 square meters and the underground construction area is 4,000 square meters. .

The total investment of the project is about 39.36 million yuan. The financial funds have been implemented.

Construction Unit: Zhengzhou City No.23 Middle School Postal address: No. 4 Jing'er Road, Zhengzhou City Postal Code: 450000
phone

Related Developments: Tower Crane Infrastructure Project

Flat Bottom Transparent Bone Pulling Bag

Woldi group produce all kinds of packing bags.such as Eight Side Sealed Packaging Bag flat bottom bag square bottom bag,Aluminum Coated Bags,Aluminum Foil Bag,Semitransparent Aluminized Yin Yang Self Sealing Bag,Flat bottom transparent bone pulling bag, PP Woven Bag ,Jumbo bag, BOPP color print bag,OPP color print bag ,Laminated PP bag and so on plastic bag.All bag accept customized,welcome your inquiry.

Flat Bottom Transparent Bag , Transparent Bone Pulling Bag , Sealed Plastic Bag

Hebei Woldi Trading Co.,LTD , https://www.woldiexport.com