Dandong Instrument Industry Creates "Dandong Speed"
On April 2, 2009, Chen Zhenggao, governor of Liaoning Province, came to Dandong and asked: “Dandong will use the instrumentation industry as the leading industry, and build Dandong City into a modern instrumentation industry base with a scale of 100 billion yuan.†Dandong The calendar of the instrumentation industry base was opened on that day. One year later, Liaoning (Dandong) instrumentation industry base reported good news. The completion of the R&D and inspection building of the instrumentation industry base, the unveiling of the Zhang Heng statue, the entry of two hundred enterprises in the second phase, and the completion ceremony of the Instrument and Metering Academy campus of the Liaoning Electromechanical Vocational Technical College were staged on the 8th.
During the interview, the reporter learned that instrumentation is a traditional industry in Dandong. Since the founding of New China, the instrumentation industry in Dandong has been known overseas. The R&D and inspection building of the instrumentation industry base completed this time is the core of the base. The total building area of ​​the building is 38,000 square meters, of which the inspection center occupies an area of ​​12,000 square meters. The R&D and testing center will integrate R&D and inspection functions, providing technical support and testing services for the incumbents.
At the scene, the reporter saw that the design of the R&D and inspection building is very unique in shape, with a ring-like connection, resembling a dashboard. He has become a landmark of the instrumentation industry base and one of the landmarks of Dandong New City.
The twenty-sixty-sixty-million-square-meter standard factory building in the second phase of the Instrumentation and Industrial Base started to be delivered in September. After the first batch of more than 50 companies in the instrumentation and industrial base last year, this time it has concentrated on 100 large-scale contracted enterprises. Settled in. Xu Weiguo, executive deputy governor of Liaoning Province, awarded the representative of the company with a “golden key†symbolizing the company’s formal entry into the plant.
The reporter was informed that up till now, Liaoning (Dandong) Instrument and Metering Industry Base has completed the construction of 500,000 square meters of standard workshops, 38,000 square meters of R&D testing centers, 100,000 square meters of instrumentation institutes, and 16,000 square meters of integrated service centers. The cumulative number of contracted companies is 310, with a total investment of 7 billion yuan; the number of start-up production enterprises has reached 52, and the main business income in the first three quarters of this year has reached 1.5 billion yuan.
Since its approval in April 2009, the Liaoning (Dandong) instrumentation industry base has spent a year and a half writing the amazing “Dandong Speed†in the history of industrial development throughout the province and even the whole country.
During the interview, the reporter learned that instrumentation is a traditional industry in Dandong. Since the founding of New China, the instrumentation industry in Dandong has been known overseas. The R&D and inspection building of the instrumentation industry base completed this time is the core of the base. The total building area of ​​the building is 38,000 square meters, of which the inspection center occupies an area of ​​12,000 square meters. The R&D and testing center will integrate R&D and inspection functions, providing technical support and testing services for the incumbents.
At the scene, the reporter saw that the design of the R&D and inspection building is very unique in shape, with a ring-like connection, resembling a dashboard. He has become a landmark of the instrumentation industry base and one of the landmarks of Dandong New City.
The twenty-sixty-sixty-million-square-meter standard factory building in the second phase of the Instrumentation and Industrial Base started to be delivered in September. After the first batch of more than 50 companies in the instrumentation and industrial base last year, this time it has concentrated on 100 large-scale contracted enterprises. Settled in. Xu Weiguo, executive deputy governor of Liaoning Province, awarded the representative of the company with a “golden key†symbolizing the company’s formal entry into the plant.
The reporter was informed that up till now, Liaoning (Dandong) Instrument and Metering Industry Base has completed the construction of 500,000 square meters of standard workshops, 38,000 square meters of R&D testing centers, 100,000 square meters of instrumentation institutes, and 16,000 square meters of integrated service centers. The cumulative number of contracted companies is 310, with a total investment of 7 billion yuan; the number of start-up production enterprises has reached 52, and the main business income in the first three quarters of this year has reached 1.5 billion yuan.
Since its approval in April 2009, the Liaoning (Dandong) instrumentation industry base has spent a year and a half writing the amazing “Dandong Speed†in the history of industrial development throughout the province and even the whole country.
Diesel Filter,Diesel Fuel Filter,Petrol Filter,Fuel Pump Filter
Ruian Shengming Auto Parts Co., Ltd. , https://www.shengfeiercar.com