Custom Plastic Parts Mould for Dark Grey Shopping Basket
Part 1:Â Item Description
Â
Company | ERBIWA MOULD INDUSTRIAL Co., Ltd |
Business Type | Manufacturing |
Products Name | Chinese high quality customized plastic injection molding for Car Plastic Secondary Instrument Panel/Dashboard |
Place of Origin | Dongguan, China |
Export Country | Germany, Japan, North America, Australian, Canada, France, Italy, etc |
Quality System | ISO9001: 2015; IATF16949: 2016 |
Mould Life | 300K-1000K Shots |
Mould base Standard | HASCO, DME, LKM, Meusburger, FUTABA, etc |
Core & Cavity Material | 718H, P20, NAK80, S316H, SKD61, 1.2311, 1.2343, 1.2343ESV, etc |
Products Material | PP, PA6, PLA, ABS, PE, PC, POM, PVC, PET, PS, TPE/TPR, etc |
Design Software | UG, PROE, Auto CAD, Solidworks, Catia V5, Visi, etc |
Runner Type | Hot runner or cold runner |
Gate Type | Side gate, Sub gate, Pin point Gate... |
Surface Treatment | Polish, High gloss Polish, Texture, Silk-screen printing, Brushed, Mirror, Anodizing, Electroplating, etc |
Equipment | CNC, EDM, Milling, Grinding, Wire Cut, Inspection, Plastic injection machine |
Package | Wooden box for mould, carton for plastic products |
Lead Time | 30-40 days for T1 |
OEM/ODM Service | Available |
Â
1 | Quotation | Need 2D/3D drawing or Samples |
2 | Mould Design | Mould design drawing could be sent for confirmation in one week after receiving the down payment |
3 | Mould Making | Start mould manufacturing only after the mould design is confirmed by customers |
4 | Mould Trial | 1st shot samples will be available for checking |
5 | Sample Confirmation | Customer to check and confirm samples |
6 | 2nd Payment | Customer need to pay for the 2nd payment once received the T1 shot samples |
7 | Mould Modification | Modify the mould if necessary |
8 | Mould Delivery | To deliver the mould after received the 3rd payment |
9 | After-Sales Service | Free of charge for 12 months warranty |
10 | Â Balance | Customer need to pay for the balance after molds having been shipped out two months |
Attention:
Pease offer the following information when you send us the mould inquiry.
a) product drawing or the sample photo with sizes.
b) mould steel you want to use.
c) standard mould base or not.
d) runner system you want(cold or hot).
Â
Part 3: Equipment List
Equipment type | Qty(Set) | Model | Brand |
Origin  |
Precision(μ) | Date of use (Year) | (x*y*z)mm |
Milling | 7 | 8SS | Taizheng | Taiwan | 0.01mm | 2014 | 600*320*330 |
4 | SHCM-97A | Gentiger | Taiwan | 0.01mm | 2016 | 650*350*360 | |
 Grinding | 10 | SGM450 | Shuguang | Taiwan | 0.003mm | 2016 | 400*150*250 |
8 | JL-614 | Joen Lih | Taiwan | 0.003mm | 2012 | 400*150*250 | |
Drilling  |
3 | Z305*16/1 | ZOJE | China | 1mm | 2016 | z=850 |
3 | M3-M16 | Xianwei | China | 1mm | 2016 | z=500 | |
EDM | 5 | cnc-edm-he130 | HSPK | China | 0.01mm | 2016 | 1300*600*400 |
8 | cnc-edm-he100 | HSPK | China | 0.01mm | 2016 | 1000*500*400 | |
6 | Sodick AM30L | Sodick | Japan | 0.005mm | 2014 | 300*200*200 | |
3 | TOPEDM MP50 | TOPEDM | Taiwan | 0.005mm | 2012 | 400*280*250 | |
4 | ARD M30 | ARD | Taiwan | 0.005mm | 2012 | 250*200*200 | |
Wire Cut  |
2 | AQ360LS | Sodick | Japan | 0.005mm | 2010 | 360*250*220 |
3 | AQ550LS | Sodick | Japan | 0.005mm | 2010 | 550*350*320 | |
2 | Charmilles 240 | Charmilles | Switzerland | 0.003mm | 2010 | 250*200*220 | |
1 | CHMER | CHMER | Taiwan | 0.005mm | 2010 | 1300*600*400 | |
1 | K7 | K7 | China | 0.01mm | 2010 | 1000*500*400 | |
CNC | 5 | α-d14mia | FANUC | Japan | 0.005mm | 2016 | 500*400*330 |
3 | MXV1020 | YCM | Taiwan | 0.005mm | 2016 | 1020*520*540 | |
3 | FV85A | YCM | Taiwan | 0.005mm | 2016 | 850*620*630 | |
Air Conditioner
Wide application in hotel, commercial building Air Conditioner. It refers to the process of adjusting and controlling the parameters such as temperature, humidity, cleanliness and speed of the ambient air in the building/structure by manual means. Generally include cold source / heat source equipment, hot and cold medium distribution system, terminals other auxiliary equipment. It mainly includes pumps, fans and piping systems. The terminals are responsible for utilizing the cooling air or heating air from the main air cooled chiller or Water Cooled Chiller, specifically processing the air and temperature of target environment to meet the requirement. The main spare parts: compressor, condenser, evaporator and expansion valve. It includes: 1. Residential Air Conditioner. Such as wall mounted split unit, Ducted Split Unit , floor standing and cassette unit with small cooling capacity 12000BTU, 18000BTU, 24000BTU, 36000BTU, 48000BTU and 60000BTU. This type air conditioner usually used for residential use. 2. Commercial Air Conditioner. Such as Air to air Rooftop Packaged Unit, Air cooled chiller, Water cooled chiller, Industrial chiller and terminals like Air handling unit and Fan Coil unit. Mainly used for commercial building and some project.
Air Conditioner Air Conditioner,Air Conditioning,Central Air Conditioner,Industrial Air Conditioner Jinan Amrta Air Conditioning Co.,Ltd , https://www.waterchiller.pl |