Wellbore signal cable construction safety technical measures

Here Xiaobian first gave an introduction to the construction steps of wellbore signal cables:

First, the decentralization of the cable 1. Before construction, the person in charge of the construction inspects the signals, tools and materials again to ensure that the signals are reliable and the tools and materials are qualified.

2. Clean debris around the wellhead to prevent debris from falling and set warnings.

It is forbidden for crowds of people to look around.

3. The construction personnel will open the cable, leave enough headroom for the wellhead and tie it to the derrick at the laying point. The remaining cable will be placed on the top of the bucket.

4. The wellhead signal is dialed to the inspection position. The winch driver toggles the control switch to the inspection position, ready to drive, and drive or stop according to the signal given by the wellhead signaler.

5. When the construction staff is ready, tell the person in charge of the construction. The person in charge of the construction shall relay the signal to the signalling worker and then the signalling worker will send a driving signal.

6. When the cable is lowered into place, the construction crew in the wellbore sends a stop signal notification signal to send a stop signal.

7. The winch driver receives a stop signal and stops immediately.

8. The construction staff in the wellbore handed the cable to the construction staff at the nose of the belt conveyor. The construction personnel here pulled the cable to the designated location and fixed it, leaving a surplus line of 1 to 2 meters.

Second, the cable is fixed. 1. The construction personnel in the wellbore stand up on the bucket and fix the cable to the cable card. After the bandage is tight, the person in charge of the wellhead construction is informed to tighten the cable and fasten it firmly, and then notify the inside of the wellbore. Construction workers.

2. After the construction staff in the wellbore receives the notification and sends a driving signal, the construction manager will send the signal to the signaler.

3. After receiving the notification, the signal maker will send a message to inform the winch driver to drive.

4. The winch driver slowly starts the winch and raises it to the wellhead position.

5. The construction personnel in the wellbore informs the person in charge of the construction to let the signal operator notify the winch driver to drive.

6. When the bucket is lowered to 6 meters, the construction crew in the shaft informs the person in charge of the construction that the signal worker will stop. After the winch has stopped, wind up the windscreen cloth on the cable and tie the cable tightly on the cable card.

7. Repeat steps 5-6 until the lashing is completed.

8. The construction personnel in the wellbore informed the person in charge of construction to raise the position of the winch to the wellhead.

8. The construction staff in the wellbore counts the tools and removes the safety belt from the bucket.

My company's slogan "Because of the focus, so professional"

Galvanized Temporary Fence

Galvanized Temporary Fence,Galvanised Temporary Fencing,Temporary Construction Fence,Galvanized Mesh Temporary Fence

Anping Xinghong Metal Wire Mesh Co.,Ltd , https://www.apironwire.com